Natural Gas Purification, LNG Extraction & Liquefaction Units
From feed gas treatment to LNG storage – modular and large-scale solutions for cleaner, high-value natural gas.Key Highlights (bullets or icons):
-
Complete purification & liquefaction line
-
BOG helium extraction for added value
-
Skid-mounted & large liquefaction factories
-
Proven projects up to 1 million m³/day
PRODUCT OVERVIEW
Integrated Natural Gas Processing & LNG Solutions
Evertech provides end-to-end systems for natural gas purification, BOG helium extraction and liquefaction. Our solutions cover every stage of the value chain—removing impurities, recovering high-value components, liquefying natural gas, and delivering safe storage and transport.
Designed for both modular deployment and large-scale LNG plants, Evertech units combine proven process technology with low energy consumption and high reliability.
NATURAL GAS PURIFICATION & LIQUEFACTION TREATMENT
Feed Gas Purification Package
Before gas can be liquefied, it must meet strict technical indicators. Evertech’s purification system prepares natural gas for pipeline or LNG service by removing acid gases, sulfur, water, nitrogen, heavy hydrocarbons and mercury.
-
Decarbonization
Removes CO₂ to meet natural gas technical indicators and downstream purification requirements, using NHD or MDEA processes or dry adsorption.
-
Desulfurization
Removes H₂S and sulfur compounds with iron wet desulfurization, MEDA desulfurization or dry adsorption technology.
-
Dehydrocarbon
Strips light hydrocarbons to recover valuable liquids and ensure gas meets specifications before entering the pipeline or liquefaction section.
-
Denitrification
Treats high-nitrogen gas that cannot be sent directly to the pipeline. Nitrogen removal raises the calorific value to required levels.
-
Dehydration
Removes water using triethylene glycol (TEG) dehydration or molecular sieve adsorption to prevent ice and hydrate formation.
-
Demercuration
Eliminates trace mercury to protect aluminum heat exchangers and downstream equipment.
NATURAL GAS – BOG HELIUM EXTRACTION
BOG Helium Recovery Systems
LNG boil-off gas (BOG) typically contains 1–2% helium. Evertech’s helium extraction package turns this trace component into a high-value product while improving liquefaction performance.
Key Process Steps:
-
Cryogenic Separation & Purification
Concentrates methane and thick helium (crude helium) using cryogenic separation, re-liquefies methane, and reduces condensation gas enrichment in the LNG unit—boosting liquefaction capacity.
-
Dehydrogenation
Removes hydrogen from crude helium via catalytic oxidation or low-temperature adsorption, lowering hydrogen content to about 1 ppm.
-
Dehydration
Removes residual water and water formed during dehydrogenation using molecular sieve adsorption, achieving water content around 1 ppm.
-
Denitrification
Removes oxygen and nitrogen with low-temperature adsorption to produce high-purity helium that meets technical specifications.
NATURAL GAS LIQUEFACTION SOLUTION
Liquefaction, Storage & Transportation
5.1 Liquefaction Front-End (Purification)
One of the first dedicated natural gas liquefaction teams in China.
-
Desulfurization: dry / wet methods
-
Decarbonization: MDEA / adsorption
-
Demercurization: dry adsorption
-
Dehydration: molecular sieve adsorption
5.2 Liquefaction Technology
Strong technical strength with low refrigeration energy consumption.
-
Refrigeration modes: MRC (Mixed Refrigerant Cycle) or nitrogen gas cycle
-
Expansion schemes: expansion / direct expansion / SMRC
-
Refrigeration temperature: ≈ −165°C
-
Liquefaction pressure: 3.0–8.0 MPa
5.3 Storage & Transportation
-
Process flow designed to be safe, reliable and easy to operate
-
Optimised layout for LNG storage tanks, BOG handling and truck loading
-
Integrated safety protection and monitoring
TYPICAL PROCESS FLOW
Typical Process of a Natural Gas Liquefaction Unit
-
Filtration & Pressure Regulation
Raw gas is filtered and pressure-regulated; solids, liquids and condensates are removed.
-
Deacidification (CO₂ Removal)
CO₂ and acid gases are absorbed and stripped, preventing freezing in cryogenic exchangers.
-
Dehydration
TEG or molecular sieve units remove water to ultra-low levels.
-
Mercury Removal
Activated carbon beds capture trace mercury to protect equipment.
-
Liquefaction & Refrigeration Cycle
Gas passes through the cold box where mixed refrigerant or nitrogen cycles cool it to LNG temperature.
-
LNG Storage & BOG Handling
LNG is stored in cryogenic tanks, with boil-off gas recycled into the process or used as fuel.
PRODUCT CONFIGURATIONS
Liquefaction Unit Configurations
7.1 Small Skid-Mounted LNG Units
For modular, fast-track projects.
-
Capacities:
-
30,000 m³/day
-
50,000 m³/day
-
100,000 m³/day
-
-
Construction period: 6–8 months
Key Advantages:
-
Factory-assembled skids for rapid deployment
-
Smaller footprint and reduced civil works
-
Ideal for remote gas fields, peak-shaving and distributed LNG supply
7.2 Liquefied Factory Units (Large-Scale Plants)
For large, long-term LNG supply and export projects.
-
Capacities:
-
300,000 m³/day
-
500,000 m³/day
-
1,000,000 m³/day
-
-
Construction period: 10–14 months
Key Advantages:
-
High throughput with optimised energy efficiency
-
Full integration with upstream and downstream infrastructure
-
Suitable for regional hubs and large industrial clusters
INDUSTRIES & APPLICATIONS
Where Our Solutions Are Used
-
LNG production and export terminals
-
City gas and pipeline gas upgrading
-
Peak-shaving LNG plants
-
Petrochemical and refinery off-gas treatment
-
BOG helium recovery facilities
-
Industrial customers requiring high-purity CO₂ and helium
PAST PROJECTS
Proven Track Record
Featured Projects:
-
Skid-Loading Natural Gas Liquefaction Project
Modular skid-mounted LNG plant demonstrating fast installation and flexible output.
-
1 Million m³/day Natural Gas Liquefaction Project
Large-scale LNG facility showcasing full Evertech process integration—from purification to storage and loading.
-
500,000 m³/day Natural Gas Liquefaction Project
Mid-large plant supplying LNG to regional industrial users.
-
Natural Gas Liquefaction Unit
Standalone cold-box / liquefaction module integrated into an existing gas processing complex.
WHY EVERTECH
Why Choose Evertech
-
Over a decade of experience in natural gas liquefaction technologies
-
Complete solutions: purification, helium extraction, liquefaction, storage and transport
-
Modular and mega-scale options to match different investment levels
-
Emphasis on energy efficiency, safety and ease of operation
-
Proven performance in multiple reference projects up to 1,000,000 m³/day
Talk to Our Engineering Team
Planning a new LNG plant, upgrading an existing facility, or looking to recover helium from BOG? Share your gas composition and capacity requirements—our engineers will propose a tailored solution.
-